Monday, February 28, 2011

Window Treatment


We are being treated to the exciting addition of the real windows to the house. So far, a couple of windows in the basement, and a few upstairs have been installed. I'll post photos as they are installed. This photo are two of the three windows in the master bathroom.

Sunday, February 20, 2011

Thank You!


to the farmer who must have spent countless hours clearing these stones from the field, most likely using horse and man power, and putting them into a huge pile in the field, so that we could, in one big shovel-full with some heavy equipment, scoop them up and deliver them to the house to be turned into our fireplace. Whenever we have a fire and admire the stones, I will say a little thank you.

Saturday, February 19, 2011

Funny Foam


The house and the workers will be happy to be warm now that the foam insulation has been applied to the ceiling and the walls. More needs to be added, but that will be after much of the mechanicals are installed.

Tuesday, February 15, 2011

Behind Closed Doors


Inside, progress is being made. Wall studs and stairs are going up (or down in the case of the stairs)

Saturday, February 12, 2011

Both Sides Now...


are covered, which means the whole house is protected from the elements. Doors have been added too, so Andy and his crew can use a little heat while working 'inside'. Next time some interior pictures!

Nike

Nike
good 'ole Nike, we miss you!