The dead mice had to be cleaned out of the pump house. |
The snow had to be cleared away so the tank could be installed |
The sap storage tank had to be hauled down to the pump house |
And now the pump house is up and ready |
There are over 300 trees to be tapped |
and there are many many feet of line to repair, and still there are more chores to be done. Stay tuned. |
No comments:
Post a Comment